Current Projects

Measure E funds and State funds are responsible for most of the upgrades to our campus. Sac will be involved in a long construction cycle possibly through this decade.  The master plan for these improvements was based on work by LPA, an architectural firm that was contracted by the District for the this purpose.  LPA has been working during the 2003-2004 academic year to develop a plan.  After much consultation with representatives from all constituencies, the master plan (PowerPoint, 03/04) is now available.  These plans will guide the work at SAC for the coming years.  Updates of plans are available at the RSCCD District web site.

Construction Timelines (PowerPoint 8/06)

Please see the Administration link for updates on the remodel and moves in that building.

© Copyright 2005, Santa Ana College, RSCCD