﻿<?xml version="1.0" encoding="UTF-8"?>
<!--RSS generated by Microsoft SharePoint Foundation RSS Generator on 5/21/2013 10:28:59 PM -->
<?xml-stylesheet type="text/xsl" href="/AboutSAC/construction/_layouts/RssXslt.aspx?List=cfed5fa8-26ee-421c-9867-77125be0f48c" version="1.0"?>
<rss version="2.0">
  <channel>
    <title>Construction Updates: Pages</title>
    <link>http://www.sac.edu/AboutSAC/construction/Pages/Forms/AllItems.aspx</link>
    <description>RSS feed for the Pages list.</description>
    <lastBuildDate>Wed, 22 May 2013 05:28:59 GMT</lastBuildDate>
    <generator>Microsoft SharePoint Foundation RSS Generator</generator>
    <ttl>60</ttl>
    <language>en-US</language>
    <image>
      <title>Construction Updates: Pages</title>
      <url>http://www.sac.edu/AboutSAC/construction/_layouts/images/siteIcon.png</url>
      <link>http://www.sac.edu/AboutSAC/construction/Pages/Forms/AllItems.aspx</link>
    </image>
    <item>
      <title>default</title>
      <link>http://www.sac.edu/AboutSAC/construction/Pages/Forms/DispForm.aspx?ID=1</link>
      <description><![CDATA[<div><b>Page Content:</b> <div><h3 class="sac-rteElement-H3"><div>Parking, Vehicle Circulation, and Pedestrian Disruption</div></h3></div>
<div><strong><em>Measure E Dollars Bring Campus Improvements</em></strong></div>
<h2 class="sac-rteElement-H2">Traffic Flow Changes as of February 4, 2013</h2>
<ul><li><div class="sac-rteElement-P">The Bristol Street campus entrance has been reconfigured and is now open for vehicle traffic.</div></li>
<li><div class="sac-rteElement-P">The College Avenue campus entrance is now open at 17th Street for vehicle traffic. </div></li>
<li><div class="sac-rteElement-P">You will now be able to access Parking Lots 11 and 12 through the College Avenue entrance and connect with Campus Drive, the interior east-west campus road.</div></li>
<li><div class="sac-rteElement-P">Parking Lot 13 located at the corner of College Avenue and 17th Street is currently closed.</div></li>
<li><div class="sac-rteElement-P">Traffic flow changes are highlighted in <span style="color:#009900"><strong>GREEN</strong></span> on the map below.</div></li></ul>
<h2 class="sac-rteElement-H2">Traffic Flow Changes Beginning February 4, 2013 through May 17, 2013</h2>
<ul><li><div class="sac-rteElement-P">The campus frontage road will be closed from Parking Lot 4 (Chavez Building) to Parking Lot 6 (Phillips Hall).</div></li>
<li><div class="sac-rteElement-P">Parking Lot 5 will be unavailable for parking during this timeframe. Please seek alternate campus parking, including staff parking in the western portion of Parking Lot 6. </div></li>
<li><div class="sac-rteElement-P">Several rows of parking in Parking Lot 6 south of the “P” building and along Bristol Street will be closed during construction.</div></li>
<li><div class="sac-rteElement-P">Construction project highlighted in <strong style="color:#0066cc"><font style="color:#0066cc"><span style="color:#0066cc">BLUE</span></font></strong> on the map below.</div></li></ul>
<p class="sac-rteElement-P">Please <a href="/AboutSAC/construction/Documents/sac-construction.pdf" target="_blank"><strong>download the campus map</strong></a> to view the above traffic flow changes.</p>
<p>For more information, please call (714) 564-6981 or <a href="mailto:Construction@sac.edu?Subject=College Avenue Construction Project"><strong>send us an email</strong></a>.</p>
<div style="text-align:left"><img alt="Construction Alert Map - College Avenue" src="/AboutSAC/construction/PublishingImages/sac-construction.jpg" style="margin:5px" /></div>
<div style="text-align:left"> <a href="/AboutSAC/construction/Documents/sac-construction.pdf" target="_blank"><strong>Download Map (PDF)</strong></a></div>
<div style="text-align:left"> </div></div>
]]></description>
      <author>Le, Hang</author>
      <pubDate>Wed, 11 Jan 2012 23:01:36 GMT</pubDate>
      <guid isPermaLink="true">http://www.sac.edu/AboutSAC/construction/Pages/Forms/DispForm.aspx?ID=1</guid>
    </item>
  </channel>
</rss>